Live edits
Live edits
Activity
- Premetro (subte de Buenos Aires)5 days agoDescribed as Extension: Nuestra Señora de Fátima stop opened on 13 March 2000.
- Premetro (subte de Buenos Aires)5 days agoDescribed as Extension: Pola station, where the two branches split, opened in 2006.
- Premetro (subte de Buenos Aires)5 days agoDescribed as Line geometry: start -34.643,-58.4616 (Intendente Saguier station) → end -34.6895,-58.4608 (General Savio station)
- Premetro (subte de Buenos Aires)5 days agoOpen from 1987-08-27
- Premetro (subte de Buenos Aires)5 days agoIn Buenos Aires
- Línea H (subte de Buenos Aires)5 days agoDescribed as Extension: Santa Fe–Carlos Jáuregui station, July 2016 (interchange with Line D).
- Línea H (subte de Buenos Aires)5 days agoDescribed as Extension: Facultad de Derecho station, 17 May 2018, the northern terminus.
- Línea H (subte de Buenos Aires)5 days agoDescribed as Line geometry: start -34.64138889,-58.4125 (Hospitales station, present southern terminus) → end -34.58306,-58.39106 (Facultad de Derecho station, present north
- Línea H (subte de Buenos Aires)5 days agoOpen from 2007-10-18
- Línea H (subte de Buenos Aires)5 days agoIn Buenos Aires
- Línea E (subte de Buenos Aires)5 days agoDescribed as Extension: Emilio Mitre, Varela and Medalla Milagrosa opened in autumn 1985 and Plaza de los Virreyes on 8 May 1986.
- Línea E (subte de Buenos Aires)5 days agoDescribed as Extension: northward to Retiro with Correo Central, Catalinas and Retiro stations, June 2019.
- Línea E (subte de Buenos Aires)5 days agoDescribed as Line geometry: start -34.62777778,-58.38130556 (Constitución) → end -34.62466667,-58.40944444 (General Urquiza)
- Línea E (subte de Buenos Aires)5 days agoOpen from 1944-06-20
- Línea E (subte de Buenos Aires)5 days agoIn Buenos Aires
- Línea D (subte de Buenos Aires)5 days agoDescribed as Extension: Juramento station opened on 21 June 1999.
- Línea D (subte de Buenos Aires)5 days agoDescribed as Extension: Congreso de Tucumán station opened on 27 April 2000, the present end of the line (11 km, 16 stations).
- Línea D (subte de Buenos Aires)5 days agoDescribed as Line geometry: start -34.60775,-58.37397222 (Catedral) → end -34.60208333,-58.38405556 (Tribunales)
- Línea D (subte de Buenos Aires)5 days agoOpen from 1937-06-03
- Línea D (subte de Buenos Aires)5 days agoIn Buenos Aires
- Línea C (subte de Buenos Aires)5 days agoDescribed as Extension: the line was extended to Retiro on 6 February 1936; Lavalle station opened the same day.
- Línea C (subte de Buenos Aires)5 days agoDescribed as Extension: General San Martín station opened on 17 August 1937.
- Línea C (subte de Buenos Aires)5 days agoDescribed as Line geometry: start -34.62777778,-58.38130556 (Constitución) → end -34.60472222,-58.37966667 (Diagonal Norte)
- Línea C (subte de Buenos Aires)5 days agoOpen from 1934-11-09
- Línea C (subte de Buenos Aires)5 days agoIn Buenos Aires
- Línea B (subte de Buenos Aires)5 days agoDescribed as Extension: Tronador-Villa Ortúzar and De los Incas-Parque Chas stations opened on 9 August 2003.
- Línea B (subte de Buenos Aires)5 days agoDescribed as Extension: Echeverría and Juan Manuel de Rosas stations opened on 26 July 2013, the present end of the line.
- Línea B (subte de Buenos Aires)5 days agoDescribed as Line geometry: start -34.60277778,-58.37 (Leandro N. Alem station, present eastern terminus) → end -34.57388889,-58.48666667 (Juan Manuel de Rosas station, pres
- Línea B (subte de Buenos Aires)5 days agoOpen from 1930-10-17
- Línea B (subte de Buenos Aires)5 days agoIn Buenos Aires